The Challenge
Foundations for a woodland boardwalk in a park were required.
The site was surrounded by trees and in a remote location where large equipment couldn’t access.
Our cliend wanted to avoid digging and pouring conrete, which would damage tree roots.
The Solution
We provided our QuadraPile helical screw pile foundations, onto which the timber boardwalk could be fixed directly.
Our small installation kit meant that there was minimal disturbance to the ground and surrounding trees.
The whole structure was installed with no concrete.
Case study reference: 18142