The Challenge
A timber pedestrian bridge within woodland at the RAC Woodcote Park required foundations.
Numerous nearby trees and access via a small dirt track meant that alternatives were ruled out.



The Solution
The nearby trees and limited access were no issue for the QuadraPile system.
Piles were installed quickly and with minimal disruption. Steelwork to accept the timber posts was then attached.
Each pile was proof load tested to ensure the required capacity was achieved.
Case study reference: 17197