The Challenge

A new building was to be constructed near to existing trees on a site with poor ground conditions.
Excavation needed to be minimised.

The Solution

We used our QuadraPile helical piles to create foundations.
Heave protection (void former) material was then installed, along with two layers of reinforcing mesh, ready for the concrete slab to be poured.

Minimal excavation was required and disturbance to the ground was kept to a minimum.

Case study reference: 26221