The Problem
A proposed new boat house on the edge of a lake, straddling the outflow stream, needed foundations.
The proximity to the water, nearby trees and restricted site access meant that concrete was ruled out.










The Solution
We provided QuadraPile helical pile foundations which could be installed quickly and very close to the edge of the water.
The piles were load tested and ready for construction of the building straight away.
Case study reference: 20128