The Problem

  • The need for quick replacement of the Enfield modular bathroom extensions to the rear of terraced houses without relocating residents.
  • Differing sizes, specifications and external finishes all had to be accommodated.

The Solution

  • We took on the project to supply and install some 43 modular extensions to the Enfield Homes housing estate.
  • The units were a range of bathrooms and shower rooms, some with Occupational Therapy adaptations and many with airing cupboards containing hot water cylinders.
  • Each replacement was carried out within a day so that residents were only without bathroom facilities for only a few hours.
  • QuadraPile foundations were used as access to the rear of the properties was restricted so the use of traditional concrete foundations was impractical.
  • External finishes were applied in the factory to minimise the time spent on site.

Case study reference: 13000