The Challenge
Foundations were required for a new raised walkway linking the hotel and restaurant at Warwick Castle.
The terrain was uneven and ground conditions variable.
The project was also on a very tight schedule.









The Solution
We installed QuadraPile helical screw piles in predefined positions ready for the steel walkway to be installed.
No concrete was used and the walkway could simply be bolted into position on the piles immediately upon completion of the piles.