The Requirement

New heat pump units required a firm platform on which to be mounted and allow future maintenance

  • Restricted space between existing commercial buildings.
  • The ground was known to be particularly poor.
  • A tight schedule of refurbishment mean rapid deployment was required.

The Solution

We provided piled foundations using our QuadraPile helical pile system.
We then supplied and installed steel beams and open mesh floor panels to form the deck ready for the heat pump plant to be installed.

Case study reference: 21166